Decided to post update on a weekly basis as the house is locked out and we can only get in during the day when someone is onsite.
Tiling is still in progress for the wet areas.
  | 
| Ensuite tiling | 
 
The cabinet maker has been onsite and installed the shelvings to WIR's, linen cupboards, galley cupboard and store.
  | 
| Master bedroom WIR | 
  | 
| Store shelves | 
Walking in the kitchen, the first thing we noticed was the splashback. Our SS has reassured us that the new supplier can make a whole piece of the glass. We selected Antique White USA and was glad that the colour has turned out very well.
  | 
| Kitchen splashback | 
Heating and cooling vents have also been installed.
  | 
| Ceiling vents | 
  | 
| Return air outside of bedroom 3 | 
One of the Networker controller provided, we elected to have an additional unit installed upstairs for convenience.
  | 
| Thermostat controller | 
Electricians have also been onsite and started on the installation of LED lights, power points, bathroom 3-1 lights, heater and fan units.
  | 
| Ventair 3-1 in master ensuite | 
  | 
| PD standard self sealing exhaust fan | 
  | 
| Installation of LED lights | 
By the end of the week, the plumbers also joined in the action and started fitting off the taps. We really love the tap in the kitchen.
  | 
| Teknobili tap | 
  | 
| Galley sink and tap | 
 