Below are just some of the issues that have been fixed. There are still others namely numerous paint touch ups everywhere. Hope this will be done to our expectations.
Electricity meter sealed |
Built in wall speakers in theatre room |
Wall mounted TV pre-wire |
Fixing of the slab issue to support the bricks |
Concrete pour to strengthen the slab |
Concrete setting |
Alfresco drain now smooth |
Water pipe fixed with 90 deg angle fitting |
Weatherseals on main doors |
Drilling of holes for washing machine pipes to connect to under cabinet taps |
Fixing of rough patches on staircase |
Fixed staircase, restained |
Fitoff of 3-1 bathroom lights |