PCI fixing week

A lot of work is happening this week to fix the issues and get the house ready by Monday for final inspection.

Below are just some of the issues that have been fixed. There are still others namely numerous paint touch ups everywhere. Hope this will be done to our expectations.

Electricity meter sealed


Built in wall speakers in theatre room

Wall mounted TV pre-wire

Fixing of the slab issue to support the bricks

Concrete pour to strengthen the slab
Concrete setting

Alfresco drain now smooth


Water pipe fixed with 90 deg angle fitting

Weatherseals on main doors


Drilling of holes for washing machine pipes to connect to under cabinet taps


Fixing of rough patches on staircase


Fixed staircase, restained
Fitoff of 3-1 bathroom lights