Below are just some of the issues that have been fixed. There are still others namely numerous paint touch ups everywhere. Hope this will be done to our expectations.
| Electricity meter sealed |
| Built in wall speakers in theatre room |
| Wall mounted TV pre-wire |
| Fixing of the slab issue to support the bricks |
| Concrete pour to strengthen the slab |
| Concrete setting |
| Alfresco drain now smooth |
| Water pipe fixed with 90 deg angle fitting |
| Weatherseals on main doors |
| Drilling of holes for washing machine pipes to connect to under cabinet taps |
| Fixing of rough patches on staircase |
| Fixed staircase, restained |
| Fitoff of 3-1 bathroom lights |
What was the problem with the water connection to your house?
ReplyDelete