Thursday, April 4, 2013

A nice present

While the brick layers continued on their work for the upstairs,  other tradies have been inside and completed the shower bases to the ensuites.

We were surprised when looking at the shower bases that they have installed the latest design of drainage compared to the traditional round drain in the centre. When we initially enquired about this design we were told these were considered an upgrade. To keep cost down, we decided to stick with the traditional hole in the middle, so what we have now is a big bonus :-) Thanks PD!!!

Shower base to master ensuite

Shower base to one of the ensuite

Heating and cooling has also been completed. The pipes are sticking down and I had to check that each one is done at the right position.

The Brivis unit has been installed in the roof above the master bedroom, I hope it will not be noisy when in use.


Heating & cooling duct

Ducts in the roof

 