Today's issues discussed were:
- Fixing of defects identified by PD QA and independant inspector report, going through the defects and ensuring they are fixed
- Roof valley to be fixed (tradies left the valley hanging on top of roof tiles)
- Only 1 solar panel was installed rather than 2
- Clarification of some electrical lights, 3 phase power location and bracket for projector
- Clarification of rangehood to be provided
- Clarification of garage remote control, wanted a wall mounted switch to operate the door, unfortunately this is not possible
- Render not smooth. It was only 1st coat. Will have another coat done when scaffolds aer removed