Friday, April 5, 2013

Inspection time........

Got a call from SS that plastering will be starting the following week and to get my independent inspection done asap so that he has time to fix any defects.

Met the inspector from New Home Inspections and gone through the first report (frame) to ensure what was highlighed as defects have been fixed.

Of the 6 items listed, only 1 has not been done and the inspector said he will mention it in the next report.

As we walked through the house, I noticed numerous red paint across some frames, some has been identified others not. These red paint was marked by PD QA people to identify defects. The inspector then explained to me what they meant. My inspector is not allowed to mark anything on the frame otherwise it may be confusing to whoever is going to fix them. From what I noticed, the defects were:
  • Bowed frames
  • Frames not plumb
  • Missing nogging
  • Frames not level
  • Frames not nailed in properly

I was a bit disappointed to see these red paints as it meant the framing guys didn't pay close attention to their jobs. I suppose framing guys think there will be inspection anyway which they have to come back to fix the defects.

Bowed frame

Another not plumb frame

As we walked upstairs we noticed 4 X's on the floor and as we walked over them it was obvious that the floor was not level. It was raised a fair bit and will require some work to level it.

Raised floor

Something to do with plumbing

Missing sarking and nogging
Inspection report when received will be passed on to the SS for urgent action before plastering.