Drop by the site today and noticed that part of the bricks have been cleaned. With the scaffold still in place, it was easier to clean the bricks for upstairs. As well the bricks at the Alfresco has been cleaned. It does look much better now, we do really like the brick colour too.
|
Cleaned bricks at Alresco |
|
Another view from sliding door at Alfresco |
Inside, there were deliveries of insulation for the walls and ceiling.
|
Bags of insulation materials |
While we were on site, the tradie was still busy installing to the insulation materials to the walls that are outside facing. He mentioned that for the ceiling, he will leave the materials on the roof, after installatin of the ceiling plaster, they will come back to finish off the installation.
|
Insulation in living room |
|
Close up of the insulation |